Sub Bid Requests

 
 
image001
License# 422496
DIR# 1000005190
555 Exchange Court

 
Project:          
Regional Sewer Pipeline Project
CWSRF Project No. -06-8753-110
 
Owner: City of Wheatland
 
Bid Date: February 10th, 2026 @ 2:00 P.M.
 
We are requesting quotes from all qualified Subcontractors and Suppliers but not limited to:
 
AGGREGATES, ASPHALT, READYMIX CONCRETE/CDF & CLSM MATERIAL, SLURRY, LOW DENSITY CELLUAR GROUT, PIPE SUPPLIERS, STORMWATER RETENTION SYSTEMS, PRECAST CONCRETE MATERIALS, EROS MATERIALS, STORAGE TANKS, GLASS LINED BOLTED STEEL TANKS, AC OILS, ASPHALT GRINDING/PAVING/STAMPED, BORE&JACK, BYPASS PUMPING, CONCRETE FLATWORK/PAVEMENT/PUMPING/SEALING/STRUCTURES, CAS, DEMOLITION, HORIZONTAL DIRECTIONAL DRILLING, ELECTRICAL-BUILDING, ELECTRICAL-STREET LIGHTS/TRAFFIC SIGNALS/LOOPS, EROSION CONTROL, CHAIN LINK & ORNAMENTAL FENCING, QC & GEOTECH ENGINEERS, HANDRAILING, HYDROSEEDING, REINIFORCED CONCRETE PIPE, HYDROPNEUMATIC TANK SYSTEMS, TANK SPRAY CLEANING EQUIPMENT, CORRUGATED METAL PIPE(Csp), SLIDE GATES/FLAP GATES & STOP PLATES, PLASTIC/HDPE/ & PVC PIPE, JOINT SEAL, LANDSCAPING, MANHOLE COATINGS/LININGS & REHAB, REBAR INFORCING STEEL, ASPHALT & CONCRETE SAWCUTTING, PAVEMENT STRIPING & MARKINGS,FABRICATED METALS & STRUCTURAL STEEL, SURVEYING, SWPPP, TRAFFIC CONTROL, TREE REMOVAL/ARBORIST, FABRICATED STEEL PIPE & FITTINGS, JACKED WELDED STEEL PIPE, DIP & FITTINGS, PRECAST CONCRETE BLDGS.,TRUCKING, CHEMICAL FEED EQUIPMENT, ACCESS DOORS & HARDWARE, BATHROOM FIXTURES, PUMPING PLANT ELECTRICAL EQUIP., DAMPPROOFING, EARTHWORK, GENERATORS/SWITCHGEAR, HVAC EQUIP. & LOUVERS/MECHANICAL, SEWR & POTABLE WATER PUMPING EQUIP., PAINTING/COATINGS, PIPE INSULATION, PLUMBING, FRP & POLYETHYLENE STORAGE TAKS, WATERPROOFING, GRATE, ROAD SIGN/SIGNAGE, VALVES/WATERMAIN/TEMP FACILITIES, GLASS & MIRROR, BLDG. INSULATION, ODOR CONTROL EQUIP.
 
Project Description:
Prepared by Coastland Civil Engineering and Nexgen Utility Management, the work Includes furnishing of all labor, materials, tax, equipment, incidentals and services for the construction and completion of the Wheatland Regional Sewer Pipeline .The Project includes but is not limited to construction of a 7.7-mile pipeline, three pump stations, horizontal directional drilling, demolition and replacement of an existing pump station, electrical controls, culvert replacement, site restoration, start-up and testing, and all other additional and various items of work as needed to construct a complete and operational project as specified in these Contract Documents.
 
Pipeline Engineers Estimate: $24,800,000    Contract Time: 380 calendar days
Pump Station Engineers Estimate: $51,400,000   Contract Time: 470 calendar days
 
Project information, including plans & specifications can be found by contacting:
 
Please feel free to contact Mountain Cascade, Inc. at 925.373.8370 with any questions concerning bonding, insurance, lines of credit, and job overview. We look forward to your response.
 
Mountain Cascade Inc. is an Equal Opportunity Employer California License # 422496
 
This is Part of a Good Faith Outreach. Your response is greatly appreciated
 

 

Mountain Cascade Inc. - Regional Sewer Pipeline Project


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



SBE Northeast
 


Louisiana Business JournalArchive