Sub Bid Requests

 



INVITATION TO BID

 

Project: IFB No. 25-1003269 – I-10 Corridor Freight and Express Lane Project – Contract 2A

 

Owner: San Bernardino County Transportation Authority (SBCTA)

 

Bid Due Date: October 28, 2025, at 2:00 PM

 

Federal Project No.: 6507(055)

 

Request for quotes from firms with California DBE Certification: Subcontractors, Subconsultants, and Material and/or Equipment Suppliers for the following, but not limited to scopes of work: Aggregate Supply, Asphalt Dike, Asphalt Paving, Biologist, Bridge Bearing Pad Supply, Bridge Demo, CIDH Pile, Clear and Grub, Cold Plane AC, Concrete Barrier, Concrete Supply, Construction Area Signs, Demolition, Electrical, Erosion Control, Fencing, Furnish and Erect Precast Girders, Geotextile Supply, Grind Existing Pavement, Guardrail, Hydroseeding, Joint Seal, Joint Seal Assembly Supply, Landscape and Irrigation, Masonry (Sound Wall), Minor Concrete, Misc. Iron and Steel Supply, Misc. Metals Supply, Noise Monitoring, Overhead Signs, Painting and Coating, PCC Material Supply, Pipe Supply, Pre/Post Construction Survey, Prestressing, QC Testing, Railing, Ready Mix Concrete Supply, Reinforcing Steel, Roadside Signs, Rock Slope Protection, Saw and Seal PCC, Slope Paving, Soldier Pile, Stain Concrete, Street Sweeping, Striping, Survey, Traffic Control Materials, Underground, Vibration Monitoring, Water Truck.

 

PLEASE SUBMIT QUOTES BY EMAIL TO SOCALBIDS@FDCORP.COM OR FAX TO (858) 271-1330

Flatiron Dragados intends to conduct itself in good faith with DBE firms for participation on this project.

 

Plans and specifications are available, at no cost, from the San Bernardino County Transportation Authority (SBCTA) https://vendors.planetbids.com/portal/20136/bo/bo-detail/131928 (Registration Required).  In order to obtain the Bid Plans and Bridge As-Builts for this project, SBCTA is requiring ALL subcontractors to complete the SSI Document release form.  Please send us an email request at socalbids@fdcorp.com to obtain the SSI Document Release Form.  The deadline to request the SSI Documents is 5:00 PM on Tuesday, October 14, 2025.  Additionally, plans and specifications are available to view at Flatiron Dragados Constructors, Inc. San Diego, CA and Chino, CA offices.  Please call to make an appointment to view the documents.

 

This project has a 22% DBE Goal.  In addition to request for participation from DBE subcontractors and suppliers, Flatiron Dragados Constructors, Inc., requests non-DBE subcontractors to provide lower-tier DBE participation.  Bidders are required to indicate lower-tier DBE participation information to be evaluated as part of their quote.

 

Quotes must be valid for the same duration as specified by Owner for contract award.  Quotes will be broken down into comparable packages as reasonably necessary to facilitate participation.  Flatiron Dragados Constructors, Inc. intends to work cooperatively with all firms for scopes of work you are licensed and qualified to perform.  Assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, and materials is available upon request.  Additionally, please contact us if you require technical assistance.

 

Subcontractors are required to possess and maintain a current contractor’s license and must also be registered with the Department of Industrial Relations (DIR) as required by Public Contract Code Section 1725.5.  Subcontractors will be required to execute Flatiron Dragados Constructors, Inc., Standard Subcontract Terms and Conditions and insurance requirements.  A copy of the document in electronic format is available upon request.

 

Bond Requirements: Notwithstanding any contrary language in a bid to Flatiron Dragados Constructors, Inc. or any prior course of dealing between Flatiron Dragados Constructors, Inc. and a bidder, and unless waived in writing by Flatiron Dragados Constructors, Inc., Flatiron Dragados Constructors, Inc. reserves the right to require each bidder to provide payment and performance bonds assuring bidder’s obligations to Flatiron Dragados Constructors, Inc. in the amount of 100 percent of the bid to Flatiron Dragados Constructors, Inc.  Flatiron Dragados Constructors, Inc. will reimburse the bond premium at actual cost not to exceed 3%.  The surety on the bonds must be a California admitted surety. 

 

Flatiron Dragados Constructors, Inc.

12121 Scripps Summit Drive. Suite 400, San Diego, CA 92131

Phone (760) 916-9100 / FAX (858) 271-1330

Email: SoCalBids@fdcorp.com

Point of Contact: Veroncia Garcia, Lead Estimating Admin

 

WE ARE AN EQUAL OPPORTUNITY EMPLOYER


Flatiron Dragados - : IFB No. 25-1003269 – I-10 Corridor Freight and Express Lane Project – Contract 2A


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



SBE Northeast
 


Louisiana Business JournalArchive