|
Sub Bid Requests
INVITATION TO BID
02.21.2025 PROJECT: BALBOA RESERVOIR BUILDING A To Bidders: Guzman Construction Group, Inc. (GCGI) team is requesting bids for: · Design Build Shoring System, Design Build Fire Suppression System, Design Build Photo-Voltaic System, Design Assist Elevators, Design Build Tower Crane Address: 11 Frida Kahlo Way, San Francisco CA 94112. Project Description: Building A will be the second affordable housing development at Balboa Reservoir with 158 affordable family units and one unit reserved for building staff. In addition to the residential uses, a large community facility, teen room, and small tot lot will be amenities available for residence. Approximately 68 parking stalls will be provided on-site along with 116 bicycle parking stalls with additional space for cargo bikes and e-bike charging. The building will be six stories of Type I-A construction. Labor Requirements: This is a prevailing wage project. All carpenter and laborer trades must be union. Sub-Contracting Goal: 25% SBE participation goal and 5% DBE / WBE / DVBE / OQBE participation goal. Schedule: 02/20/25 – Start of Advertisement 03/06/25 – RFI Deadline 03/07/25 – Prebid Meeting at 10:00 AM (optional) Microsoft Teams Join the meeting now Meeting ID: 274 826 612 363 Passcode: 9pi9W2Ss 03/24/25 – Bids Due 5:00 PM Monday 02/2026 – Tentative Construction Start (Refer to Exhibit C) Contractor Contacts: Roger Giese rgiese@guzmangc.com (415) 439-3002 Hasan Demirkol hdemirkol@guzmangc.com (650) 307-2798 Please do not contact the Owner, Owner Agents, and/or Architect directly. Bid Documents: All documents for this bid can be downloaded from the project site on Building Connected, which you have access to via the email invite you received. Also, the project information is available at the following Box link: https://www.dropbox.com/scl/fo/tusmp3n6ocqkw2muxwyjw/AOY-TgEKmmBQ0I4-7lReBjg?rlkey=o5xxz0u0hok0s6j54x2ligo5x&st=3x4j1f96&dl=0 Guzman Construction Group Inc - BALBOA RESERVOIR BUILDING A Email To Friend« Go Back |
|