|
Sub Bid Requests
SUB/SUPPLIER-BIDS REQUESTED
Manson Construction Co. is requesting sub and supplier quotes from qualified Disadvantaged Business Enterprises (DBE) and Small Business Enterprises (SBE) for: San Francisco Ferry Terminal West and East Berth Ramp Rehabilitation Golden Gate Bridge, Highway and Transportation District Contract No. 2024-F-010 REVISED BID DATE: SEPTEMBER 10, 2024 @ 2pm PST SUB & SUPPLIER QUOTES REQUESTED BY SEPTEMBER 6TH, 2024 BY 4PM PST ALL QUOTES MUST BE SUBMITED WITH SBE/DBE CERTIFICATION AND SBE AFFIDAVIT OF SIZE FORM POTENTIAL SUBCONTRACTOR & SUPPLIER SCOPE OPPORTUNITIES: Furnish and Install Mechanical Piping; Furnish and Install Electrical and Communications Systems; Low Voltage Electrical Systems; Hydraulic Systems; Trucking; Steel Coating; Structural Steel Repairs; and Equipment Rental PROJECT DESCRIPTION:This public works Project consists of, in general, rehabilitating the San Francisco Ferry Terminal existing west and east berth ramps. At the west berth, the work includes refurbishing the existing hydraulic systems including refurbishing the existing hydraulic cylinders, removing and replacing existing hydraulic lines, removing and replacing existing electrical and control systems, removing and replacing existing hydraulic equipment such as pumps, valves, manifolds, and tanks, and testing and commissioning the new hydraulic systems. At the east berth, the work includes disconnecting the existing steel ramp from the terminal and transporting it to an offsite facility to perform structural steel repairs as well as refurbishing the hydraulic system. The structural steel repairs include repairing cracked elements, strengthening the ramp and sandblasting and coating the steel elements, transporting and reinstalling the ramp, and performing all testing and commissioning to ensure the ramp function. Concrete repairs at the east berth are also included, all other work required to complete the Project titled San Francisco Ferry Terminal West and East Berth Ramp Rehabilitation, as shown on the Contract Plans and as specified in the Contract Documents. Manson Construction Co. intends to seriously negotiate with qualified firms, including small, disadvantaged, minority, and woman-owned business enterprises, for project participation in all applicable disciplines. To maximize participation, Manson will work with individual firms to divide scopes of work to best fit the capabilities of each firm. We will assist interested firms with questions regarding insurance, bonding, Buy American Act, and contract. For plans and specifications go to https://ggbhtd.bonfirehub.com/opportunities/121934. Please direct inquiries to: Matthew Lehmann atMLehmann@mansonconstruction.comor 510-232-6319. MANSON CONSTRUCTION CO. 1401 Marina Way South, Suite 330 Richmond, CA 94804 EQUAL OPPORTUNITY EMPLOYER MANSON CONSTRUCTION CO. - San Francisco Ferry Terminal West and East Berth Ramp Rehabilitation Email To Friend« Go Back |
|