Sub Bid Requests

 

ALL POTENTIAL ALL and DVBE SUBCONTRACTORS
*********************************************************************************
     THOMPSON BUILDERS CORPORATION is requesting bids from DVBE subcontractors, suppliers &   truckers for the following project. 
 
   Walters Junior High School – New Buildings Project
Fremont, CA
Owner: Fremont Unified School District
 
Bid Date:   11/17/17 @ 2:00 PM        Estimate:  $16,000,000   Goal:  3% DVBE  
        

 
TRADES NEEDED (but not limited to):
Division 02 – Existing Conditions (Subsurface Investigation and Selective Demolition)
Division 03- Concrete (Concrete forming; Concrete Reinforcing; Cast-In-Place Concrete; Vapor Emission Treatment; Concrete Finishing; Integrally Colored Concrete)
Division 05 – Metals (Structural Steel Framing; Metal Decking; Structural Metal Stud Framing; Metal Fabrications; Metal Stairs and Railings)
Division 06- Wood, Plastics and Composites (Rough Carpentry; Glued Laminated Construction; Plastic Laminate Clad Architectural Cabinets)
Division 07 – Thermal and Moisture Protection (Sheet Waterproofing; Crystalline Waterproofing; Building Insulation; Below Grade Vapor Barriers; Metal Roof Panels; Arch Metal Deck Design Calculations; Single Ply Roofing System; Sheet Metal Flashing and Trim; Flexible Flashing; Roof Hatch and Ladder; Firestopping; Joint Sealants)
Division 08 – Openings (Metal Doors and Frames; Flush Wood doors; Access Doors and Frames; Overhead Coiling Doors; Aluminum Sun Shades; Aluminum Windows; Tubular Daylighting Devise; Door Hardware; Glass Glazing; Louvers and Vents)
Division 09 – Finishes (Non-Structural Metal Framing; Acrylic Modified Portland Cement Plastering; Gypsum Board; Tiling; Suspended Acoustical Ceilings 09 60 00 Resilient Sheet Flooring; Resilient Flooring; Seamless Epoxy Flooring; Vinyl Covered Tackable Wall Panels; Acoustic Treatment; Painting and Coating)
Division 10- Specialties (Visual Display Surfaces; Signage; Toilet Partitions; Toilet Accessories; Fire Extinguishers and Cabinets; Assistive Listening Devices)
Division 11 – Equipment (Projection Screens)
Division 12 - Furnishings (Horizontal Louver Blinds; Plastic Countertops)
Division 14 – Conveying Equipment (Hydraulic Passenger Elevator)
Division 21 – Fire Suppression (Water based Fire Suppression Systems; Wet Pipe Fire Sprinkler System)
Division 22 – Plumbing (Plumbing; Commissionning of Pllumbing)
Division 23 – Heating, Ventilating, Air Conditioning (HVAC) (General Mechanical Requirements; Commissioning of HVAC; Heating, Ventilating, Air Conditioning; Split System Air Conditioning)
Division 25 – Integrated Automation (Instrumentation and Control for HVAC)
Division 26 – Electrical (Basic Electrical Requirements; Basic Electrical Materials and Methods; Electrical Identification; Grounding and Bonding; Electrical Hangers and Supports; Electrical Supports and Seismic Restraints; Commissioning of Electrical Systems; Lighting Control Devices; Modular Dimming Control; Addressable-Luminaire Lighting Controls; Raceways and Boxes; Conductors and Cables; Wiring Devices; Panelboards; Overcurrent Protective Devices; Enclosed Switches and Circuit Breakers; LED Interior Lighting; Emergency and Exit Lighting; LED Exterior Lighting; Special Systems; Transient Surge Suppressors)
Division 27 – (Technology Network Installation and Documentation; Test and Acceptance Requirements; Common Work Results for Communications; Grounding and Bonding for Communications Systems; Hangars and Supports for Communication Systems; Conduits and Backboxes for Communication Systems; Surface Raceways for Communication Systems; Underground Ducts & Raceways for Communications; Noise and Vibration for Communication Systems; Identification for Communication Systems; Structured Cabling, Basic Materials and Methods, Communications Entrance Protection, Communications Cabinets, Racks, Frames and Enclosures; Communications Termination Blocks and Patches; Communication Cable Management; Communications Indoor Backbone Cabling; Communications Outside Plant Backbone Cabling; Communications Horizontal Cabling; Public Address & Intercommunication Systems; Clock and Program Systems; Attachment to Clock Program Systems; LAN Systems Classroom; Small-Medium Offices; Wireless Local Area Networks (WLANS))
Division 28 – Electronic Safety and Security (Fire Alarm System)
Division 31 – Earthwork (Site Clearing; Earth Moving; Trenching and Backfiling; Drilled concrete Piers and Shafts)
Division 32 – Exterior Improvements (Aggregate Base Course; Asphalt Paving; Concrete Paving; Chain Link Fences and Gates; Ornamental Picket Fence; Irrigation; Landscape)
Division 33 – Utilities (Water Utility Distribution piping; Sewage Utilities; Storm Utility Drainage Piping)

Please submit bids to us by noon on bid day.

 
*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
 
We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement.  Certification of insurance for General Liability and Workers’ Compensation are required.  A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required.  Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.
 
TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed at various local Builder’s Exchanges, in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato, Monday  through  Friday  from 7:30 AM to 4:30 PM.  Or may be emailed upon request.  Or may be downloaded from the link:
https://tpcorp.box.com/s/adyeyswfvna9uyj5327aoopktrekq7b5

 
Thompson Builders Corporation is an Equal Opportunity Employer
Contact:  Dalia Nieto  (415) 456-8972        FAX: (415) 459-0665
EMAIL:  dalian@tbcorp.com

THOMPSON BUILDERS CORPORATION - Walters Junior High School – New Buildings Project


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



Archive




 


Connect with us