Sub Bid Requests

 
DeSilva Gates Construction (DGC) is preparing a bid as a Prime Contractor for the project listed below:
 
PROJECT:                
AIRPORT PERIMETER DIKE PHASE 2 SEISMIC IMPROVEMENTS SOUTH FIELD, OAKLAND INTERNATIONAL AIRPORT, AIP 3-06-0170-(FUTURE), Small Business Enterprises Goal Assigned 3%
 
OWNER: PORT OF OAKLAND – 530 Water St., Oakland, CA 94607
 
BID DATE:
MAY 29, 2024 @ 12:00 P.M.         ESTIMATOR:JACK SHEWMAKER
 
DGC is soliciting quotations from certified Small Business Enterprises, for the following types of work and supplies/materials including but not limited to:
 
Develop Water Supply, Erosion Control, Slurry Wall, Survey/Staking, SWPPP Prep/Water Pollution Control Plan Prepare, Temporary Erosion Control, Testing, Trucking, Water Trucks, Street Sweeping, Erosion Control Material, Class 2 Aggregate Base Material
 
Plans and specifications may be reviewed at our offices located at 11555 Dublin Boulevard, Dublin, CA or 3855 N Freeway Blvd Suite 100, Sacramento, CA 95834, or at your local Builders Exchange, or reviewed and downloaded from the dropbox site at https://www.dropbox.com/sh/5rvdc1bwfbasgl9/AABbrd0ba51_kN3GtAESfBUoa?dl=0or from the Owner’s site at www.dot.ca.gov/hq/esc/oe/weekly_ads/all_adv_projects.php
 
Fax your bid to (925) 803-4263 to the attention of Estimator Jack Shewmaker. If you have questions for the Estimator, call at (925) 829-9220.  When submitting any public works bid please include your DUNS number and DIR number.  For questions regarding registration for DIR use the link at www.dir.ca.gov/Public-Works/PublicWorks.html
 
If you need SBE support services and assistance in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies or related assistance or services, for this projectcall the Estimator at (925) 829-9220, or contact your local Small Business Development Center Network (http://californiasbdc.org) or contact the California Southwest Transportation Resource Center (www.transportation.gov/osdbu/SBTRCs). DGC is willing to breakout portions of work to increase the expectation of meeting the SBE goal.
 
At our discretion, 100% Payment and 100% Performance bonds may be required as a subcontract condition. This will be a PREVAILING WAGE JOB. DGC is an Equal Opportunity/Affirmative Action Employer.

DeSilva Gates Construction - AIRPORT PERIMETER DIKE PHASE 2 SEISMIC IMPROVEMENTS SOUTH FIELD, OAKLAND INTERNATIONAL AIRPORT, AIRP 3-06-0170-(FUTURE)


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



SBE Northeast
 


Louisiana Business JournalArchive