Sub Bid Requests

 


Sylmar Charter High School

Project Information:

Bids Due: Tuesday, November 10, 2026 by 2:00pm

Kemp Bros. Construction, Inc. is Seeking Qualified Subcontractors and Suppliers to provide proposals for the Sylmar Charter High School located at 13050 Borden Avenue, Sylmar, CA 90670, Sylmar, CA, 91342.

Project Description:
The Major Modernization project for the Sylmar Charter High School includes the construction of a new 2-story building with an MPR, Music Classrooms, Student and Staff Dining, Food Service, Student Store, Special Education and General Classrooms, a Lunch Shelter, and a Trash / Transformer / Battery Storage enclosure consisting of all associated site and utility improvements related to the new building. To prepare for the new building, a Make Ready phase will include the demolition of existing buildings and canopies (Building 19, 20 and MPR building / Lunch Shelter), construction of LADWP Yard and Chiller, construction of a separate LAUSD Electrical, installation of new Substations and distribution boards, new feeders to existing substations, and all associated sitework including trenching for underground utilities, new concrete paving, and new fencing. Installation of an Interim Housing site will include the removal of two existing modular classrooms, one Food Service / Scramble modular building, one Restroom modular building, one Classroom modular building, one Student Store building, one smaller Restroom modular building, construction of one trash enclosure, interim refrigerator and freezer, and associated site improvements and utility work. Adjacent to the Interim Housing location, the addition of one permanent lunch shelter will be constructed consisting of all associated site work including paving, fencing, gates, switch gear, and fire lane extension. Throughout the duration of the project, accessibility upgrades will be completed which include existing classrooms, restrooms, locker rooms, showers, drinking fountains, sinks, signage, doors, casework without low counters at Buildings 1, 2, 3, 4, 5, 16, 21, 22, 23, 25, 29, 31 and 32. At the end of the project, the existing buildings, site walls, and canopies will all be repainted and Lots 1, 1A, and 3 will be restriped.

Bid Packages (include but not limited to): Movers, SWPPP, GPR and Potholing, Surveying, Abatement, Demolition, Rebar, Structural Concrete, Masonry, Structural Steel, Metal Decking, Miscellaneous Metals, Rough Carpentry, Casework, Waterproofing, Insulation, Roofing, Sheet Metal, Doors / Frames/ Hardware, Overhead Coiling Doors, Storefront, Curtainwalls & Windows, Drywall & Stucco, Ceramic Tile, Ceilings, Flooring, Painting, Markerboards & Tackboards, Signage, Toilet Partitions & Bathroom Accessories, Operable Partitions, Lockers & Benches, Shelving, Projection Screens, Theatrical Rigging, Blinds, Fire Sprinkler, Plumbing, HVAC, Electrical, Low Voltage, Earthwork, Paving, Fence & Gates, Landscaping, Site Concrete, and Site Utilities.

·      Project Type: PSA
·      Bids are to be good for 6  months from bid date.

Interested Subcontractors should contact: bid@kempbros.com

Kemp Bros. Construction, Inc. - Sylmar Charter High School


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



SBE Northeast
 


Louisiana Business JournalArchive