Sub Bid Requests

 


Inglewood Transit Connector - 90% Post GMP
Request for Proposals (RFP) submission due
September 8, 2026, at 2:00pm PST
 
Swinerton Builders is requesting proposals for the Inglewood Transit Connector (ITC) Project – 90% Post GMP.
 
Project Overview:ITC Phase 1 will deliver enabling works to improve traffic congestion and acquire key right-of-way parcels before the 2028 Olympics. It includes mobility hubs with parking and transit amenities, mini-mobility hubs with amenities for surface parking other uses, dedicated event bus lanes, and pedestrian improvements. The city envisions connecting parkers at the mobility hubs to destinations using shuttles that would be expedited using transit-only lanes, while preserving the development for a future Automated People Mover between the Sports and Entertainment District and Downtown Inglewood Metro Station.
 
ITC Scope of Work:
The scope of work includes three (3) Mobility Hubs - MH-1, MH-2 & MH-3, Pedestrian Bridge connecting Metro K-Line and Streetscape Improvements (together, the “Project Elements”) which are described below. The objective is to implement all Project Elements with the following considerations:
Site 1 - Market Florence Mobility Hub (MH-1)
Site 1A - Streetscape (Market, Regent, Locust, Florence)
Site 1B - Retail Buildings
Site 2 - La Brea Ave & Kelso Street Mobility Hub (MH-2)
Site 3 - Market & Manchester Mobility Hub (MH-3)
Site 4 - Pedestrian Bridge Connection connecting Metro K-Line
Streetscape Improvements
Site 5.A- Market St.
Site 5.B- Queen St.
Site 5.C - Manchester Blvd.
 
Project Requirements:
1. Applicable Federal Requirements (Appendix A-2A)
2. State Requirements including Prevailing Wages and Labor Code Provisions (Appendix A-2B)
3. City Requirements
4. The City's DBE Participation plan and SBE / LBE goals
5. Community Labor Agreement (CLA, Appendix A-3)
 
Bid Packages (includes but is not limited to):Structural Steel – Pedestrian Bridge (Site 4), Abatement, Elevators (Rebid), Sheet Metal, Façade, Overhead Coiling Doors, Piles & Caissons, Site Utilities – Streetscape, Ceramic Tile, Acoustical Ceilings, Flooring, Granite Flooring, Polished Concrete, Signage – MH-1, Signage (Streetscape), PARCS & PGS, Pavement Marking- MH-1, Pavement Markings (Streetscape), Fences & Gates
 
Virtual Outreach Meeting
Interested firms are invited to attend a Virtual Outreach Meeting on Thursday, August 27, 2026, at 10:00 AM (PST) via Zoom. Virtual Event Registration Link: https://forms.gle/r6an74nBed9P63Ny6
 
Subcontractors must be prequalified with Swinerton prior to close of RFP deadline.
Subcontractors can submit or renew their prequalification documents at: http://www.swinerton.com/subcontractors/subcontractor-prequal.
If you have any questions related to the prequalification process, please reach our Team at: subcontractorprequal@swinerton.com
 
All subcontractors must provide Payment and Performance Bonds with their bid. Bond coverage under SDI will not be provided by Swinerton. Please provide bond rate together with single project bond $ limit for scope of work to be performed in your proposal. List of certified companies:  https://fiscal.treasury.gov/files/surety-bonds/list-certified-companies.pdf.
 
NOTE: If you are interested to know more about this bid opportunity, or need assistance in obtaining plans, bonding, lines of credit, insurance, necessary equipment, supplies, materials, or related assistance or services, please reach out to Swinerton at EstimatingLA@swinerton.com  or call (213) 896-3400.
 
Swinerton is an Equal Employment Opportunity, Minority, Women, Disability, and Veteran Employer.

Swinerton Builders - Inglewood Transit Connector - 90% GMP


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



SBE Northeast
 


Louisiana Business JournalArchive