Sub Bid Requests

 
 
 
Our firm, An Equal Opportunity Employer, is requesting quotations from all qualified Certified SBE, DVBE sub-contractors and/or material suppliersto submit bids on the following project:
 
THE METROPOLITAN WATER DISTRICT
OF SOUTHERN CALIFORNIA
Colorado River Aqueduct Pumping Plants Sump Rehabilitation
(Specification No. 2008)
 
Business Enterprise Goal & Fair Share SBE, DVBE Participation
 
Bid Date: July 14, 2026 @ 2:00 P.M.
 
Email: bid@rados.com
 
Sub-Trades Suppliers Needed For The Following Work (but not limited to):
PIPE SUPPLIER, CONCRETE PUMPING, MINOR CONCRETE STRUCTURE, CORE CONCRETE – REPAIR BRIDGE DECK, JOINT SEAL, REINFORCING STEEL, PAINTING/COATINGS, WELDED STEEL PIPE CASING, WELDING CONTRACTOR, METAL FABRICATIONS, SAW CUTTING, CONSTRUCTION SCHEDULING, LEAD COMPLIANCE PLAN, LEAD ABATEMENT, SWPPP PLANNING, SUPER 10 DUMP TRUCK, FLAT BED TRUCKING, STREET SWEEPING TRUCK, CRANE WORK, FLOOR COVERING, HEATING, VENTILATING & AIR CONDITIONING, ASBESTOS REMOVAL/ABATEMENT, CUTTING, CONSTRUCTION EQUIPMENT RENTAL, DEMOLITION, POTHOLING
 
NAICS:
237110, 237310, 238110, 238120, 238190, 238210, 238220,  238320, 238330, 238910, 238990, 332312, 423510, 484220, 488490, 532412, 541330, 541620, 562910
 
S.P. Rados, Inc. is a Signatory Union Contractor. Subcontractors will be required to abide by the terms and conditions of the AGC Standard Long Form Subcontract incorporating prime contract terms and conditions, including payment provisions & insurance requirements.  S.P. Rados, Inc.’s listing of a subcontractor is not to be construed as an acceptance of all the subcontractor’s conditions or exceptions included with the Subcontractor’s price quote. Subcontractors will be required to provide a payment & performance bond from an approved surety company for 100% of the subcontracted work.  S.P. Rados, Inc. will pay bond premium up to 1.5% (optional). 
 
Please be advised, Contractors and Subcontractors must register with the D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with the D.I.R. costs $300 and covers the fiscal year (July 1 to June 30th). To verify status of your D.I.R. number, please visit: http://.dir.ca.gov/Public-Works/Contractors.html.
 
Assistance is available in obtaining bonds, lines of credit and/or insurance. We will consider dividing total requirements when economically feasible into smaller tasks or quantities to permit participation by SBE, DVBE in the competitive process. We will assist in obtaining necessary equipment, supplies, materials & related assistance or services. S.P. Rados, Inc. requires that Subcontractors and Suppliers price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation.
 
Plans and Specifications are available free of https://stevepradosinc.sharefile.com/d-s0b0b341850014ce0a81c2a4eb6f00cde also available for viewing at 2002 E. McFadden Ave., Ste. 200, Santa Ana, CA 92705 call our office to schedule a review of the plans and specifications (714) 835-4612.

Steve P. Rados, Inc. - Colorado River Aqueduct Pumping Plants Sump Rehabilitation (Specification No. 2008)


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



SBE Northeast
 


Louisiana Business JournalArchive