PCL Construction, Inc. is soliciting Certified LBE/DBE/MBE/WBE/SBE/DVBE/OBE/ Subs & Suppliers to bid the
DB 134 – Southeast Treatment Plant (SEP) Biogas Utilization Project in
San Francisco, CA for the City and County of San Francisco


Bids are due March 8, 2024 @ 2:00PM (PT).

PCL intends to break up the requirements into smaller portions to encourage maximum participation, arrange time frames for contracts and establish delivery schedules, where the requirements permit, in a way that encourages and facilitates participation of DBE’s. Payment & Performance Bonds may be required & bonding assistance is available. Subcontractors and Suppliers are encouraged to contact PCL for insurance requirements, equipment & materials, or if any other assistance is needed. PCL celebrates diversity and is proud to be equal opportunity employer. For further assistance & to request plans contact Andrea Chavez at 480-763-2743 or via email at
andreachavez@pcl.com. CWSRF & WIFIA funding requirements apply. This includes but not limited to: AIS, BABA, Davis-Bacon/Prevailing wages, Equal Employment Opportunity (EEO), Civil Rights Obligations, PLA Local Area Apprenticeship, Fair Share Objectives, DIR Registration & CA License.

NAICS: 237310, 238210, 238220, 238290, 238310, 238910, 238990, 332996.

The project site is approximately 10,400SF and located at the South side of the Southeast Treatment Plant, 1801 Jerrold Ave.

Scopes needed: demolition, soil remediation, ground improvements, concrete foundations, underground utilities, plumbing, crane rental services, electrical, instrumentation, sound attenuation, mechanical equipment setting, exposed mechanical pipe installation, pipe fabrication, fencing, concrete curb & gutter, asphalt, striping, and signage. The project also includes an interconnect station to inject the upgraded biogas into the PG&E pipeline. This portion of the project will be located across the street at 1801 Jerrold, at the corner of Jerrold Ave and Quinn St. Refer to Part A Overview and Part B Design and Construction Requirements in the plan room for more project specific description of work to be installed.


PCL Construction, Inc - DB 134 – Southeast Treatment Plant (SEP) Biogas Utilization Project in San Francisco, CA for the City and County of San Francisco


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



SBE Northeast
 


Louisiana Business JournalArchive