|
|
Sub Bid RequestsGarney Companies, Inc. is submitting a proposal for the Arkansas Valley Conduit Spur and Delivery Lines – SRF Package 1 CM/GC project as a prime contractor and is actively seeking DBE participation, including but not limited to firms with MBE, WBE, or DBE certifications. PROJECT: Arkansas Valley Conduit Spur and Delivery Lines – SRF Package 1 CM/GC project OWNER: Southeaster Colorado Water Conservancy District LOCATION: Otero County, Colorado – several locations BID DATE: November 19, 2026 at 2:00pm QUOTES DUE BY: Due to the nature of this response, we must have all quotes and 6100-3 forms submitted no later than 5pm on November 17, 2026. PROJECT DESCRIPTION:The Project consists of the construction of approximately 22 miles of potable water transmission and distribution pipeline and appurtenances serving eleven (11) delivery lines in Otero County, Colorado, as part of the Arkansas Valley Conduit. The Work includes: · Installation of approximately 117,000 linear feet of 4-inch through 8-inch diameter potable water pipeline (to deliver raw filtered water) by open cut and trenchless methods. · Trenchless crossings of irrigation canals and ditches, drainages, county roads, and Colorado Department of Transportation corridors, including bored and encased crossings and, where permitted, horizontal directional drilling. · Delivery vaults, metering vaults, pressure-reducing and control valve vaults, air release and blow-off assemblies, and interconnections to participant distribution systems. · Booster pump stations serving the Patterson Valley, Newdale Grand Valley, and Valley Water delivery lines. · Electrical service, instrumentation, controls, and communications, including coordination of new electric service with Black Hills Energy. · Site restoration, erosion and sediment control, traffic control, dewatering, hydrostatic testing, disinfection, and management of test and disinfection water in accordance with applicable discharge authorizations. The Work is currently organized in up to five (5) Work Packages.Work Package 1 is issued with this RFP as a complete work package and will be priced by Proposers as part of the Proposal. Work Packages 2 through 5 will be delivered through the standard CM/GC process, with a Guaranteed Maximum Price (GMP) developed for each package during the Preconstruction Phase. Once under contract, the selected CM/GC Proposer will be responsible for determining the sequence of work and developing the additional work packages in coordination with the District. We are requesting quotes for the following types of work: Paving, Asphalt – 324121; Paving, Concrete – 238990; Materials Testing – 541380; Surveying – 541370; Environmental Controls and Compliance – 423830; Traffic Control – 532490; Hydrovac Potholing – 238910; Trucking – 562119 Please let us know if you need work items separated into smaller tasks or quantities to allow your participation. If you require an additional breakdown of an item or have other areas you are interested in bidding, please reach out to us to discuss available options. We will accommodate requests whenever possible and when economically feasible. Garney requires that all potential subcontractors are prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Garney will reimburse subcontractors for the required bond premium, so please provide your bond rate at the time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of Garney, unless the project documents note otherwise. Please contact us for any insurance, bonding or other project-related questions. Garney Companies, Inc. is an Equal Opportunity Employer and is available to assist where needed. We strongly encourage all DBE firms interested in this project to submit a competitive bid. Garney fully intends to meet or exceed the participation requirements for this project and is prepared to assist all subcontracting firms in achieving their highest quality of work while maintaining the industry’s most competitive values. The participation goals for this project are: 6.1% MBE, 6.6% WBE. Garney shall not discriminate on the basis of race, color, national origin or sex in the performance of this contract. Garney shall carry out applicable requirements of 40 CFR part 33 in the award and administration of contracts awarded under EPA financial assistance agreements. Failure by the contractor to carry out these requirements is a material breach of this contract which may result in the termination of this contract or other legally available remedies. Bid Documents are available through our website at https://www.garney.com/upcoming-bids/. Please contact Nikia Steppins at nsteppins@garney.com with any questions. Garney Companies, Inc - Arkansas Valley Conduit Spur and Delivery Lines – SRF Package 1 CM/GC project Email To Friend« Go Back |
|





