Project
City of San Diego — Alvarado Trunk Sewer Phase IV and Water Main Relocation, Bid Package A
Bid No. K-27-2470-DBB-3-C
Location Fairmount Ave, Twain Ave, Mission Gorge Pl, and surrounding Alvarado Trunk Sewer alignment, San Diego, CA
Sub-Quotes Due Monday, October 26, 2026 by 5:00 PM to McCarthy (earlier submittals appreciated)
Bid Date Wednesday, October 28, 2026 by 2:00 PM PDT — electronic submittal via PlanetBids

Description / Scope
Approx. 5,216 LF new sewer pipe; groundwater dewatering and discharge; bypass pumping; landscaping; hazardous material handling; laterals and reconnections; trenchless work; traffic control; repaving; signal-loop replacement; and curb ramps. Water-main relocation: approx. 5,886 LF of 6", 8", 12", and 16" AC main replacement including hydrants, valves, water services, resurfacing, traffic control, and striping.
Trade partners requested: Jobs Coordinator, Archaeological and Native American Monitoring, Paleontological Monitoring, Landscaping/Irrigation, SWPPP, Survey, Aggregates, Traffic Control, Bypass Pumping, Jack & Bore, Micro Tunneling, Dewatering, Haz Material, Paving, Striping, Precast Concrete, Manholes, Sitework/Flatwork, Pipe, Valves, and Traffic Loops.
 

Documents & Federal DBE / GFE Requirements
Bid documents are available through Building Connected after signing an NDA; contact the estimator for access, insurance requirements, and the McCarthy subcontract agreement. This is an EPA Clean Water State Revolving Fund (CWSRF)-assisted project subject to 40 CFR Part 33. DBE firms must be certified at bid opening through an accepted DBE program and provide proof. Certified DBE participation is strongly encouraged.
 

Labor / PLA / Prevailing Wage
Covered by the City of San Diego Citywide Project Labor Agreement (Letter of Assent required). State and federal prevailing wages apply; DIR registration required.
 

Bidder Requirements
·       Licensed Contractor: Bidder must hold the applicable California license classification(s) for its trade.
·       Prequalification: Firms must be prequalified by McCarthy: https://prequalification.mccarthy.com
·       Subcontract: Successful bidders execute the McCarthy Standard Subcontract Agreement (copies on request).
·       Bid Bond: McCarthy may request bid bonds for proposals greater than $500,000.
·       Performance/Payment Bond: 100% of subcontract value required for contracts over $100,000 (admitted CA surety, A.M. Best A- or better); McCarthy CDI program available in lieu of bonds, subject to preapproval.
·       Insurance/Safety: Maintain insurance per the Contract Documents and McCarthy Subcontract; comply with the McCarthy Safety Program.
·       McCarthy will assist qualified firms with bonding, insurance, lines of credit, equipment, materials, supplies, and scope breakdowns as needed.
·       McCarthy is signatory to union agreements with the Carpenters, Operators, Laborers, and Cement Masons. Subcontractors will comply with such labor agreements for all of Subcontractor’s Work falling within the jurisdiction of such labor agreements. Subcontractor agrees to require its subcontractors and their subcontractors, if any, to be bound in a like manner.

McCarthy is an Equal Opportunity Employer and encourages DBE, MBE, WBE, SBE, SLBE, ELBE, DVBE, and other XBE participation.

Contact — Questions / RFI / Submission (Last day of RFI is 14 days prior to bid closing)
Jamie Howard, Preconstruction Director   ·   949-898-1043   ·   jrhoward@mccarthy.com
McCarthy Building Companies, Inc.  ·  20401 SW Birch Street, Newport Beach, CA 92660  ·  License #411173

MCCARTHY BUILDING COMPANIES - City of San Diego — Alvarado Trunk Sewer Phase IV and Water Main Relocation, Bid Package A


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



SBE Northeast
 


Louisiana Business JournalArchive