|
|
Sub Bid RequestsINVITATION TO BID 09/01/2026 FREEDOM WEST - 880 MCALLISTER STREET, SAN FRANCISCO, CA BIDS DUE: 10.01.2026 at 2:00 PM Guzman Construction Group, Inc. (GCGI) team is requesting bids for all trades (except Shoring, Ground Improvements, Earthwork, Demolition, Fire Sprinkler, Elevator, Tower Crane). Trades/scopes shall be considered Final Hard Bid and are anticipated to be awarded in this round of pricing. Address:880 McAllister St, San Francisco CA 94102. Project Description: The existing 860, 870 and 880 McAllister Street buildings will be replaced with a new seven-story building that provides 100% affordable senior housing. The 99,163 SF new construction building consists of 115-units, and supporting administrative offices, and amenities, including a roof terrace, courtyards, and a large community room. The residential units are comprised of 78 one-bedroom and 37 two-bedroom units. All Project units will be offered for-rent to senior citizens at an anticipated 60 percent area median income (“AMI”). The project incorporates approximately 5,002 square feet of usable open space for residents ‘enjoyment through the two ground-floor landscaped courtyards and the roof terrace. The project includes limited corner commercial space on the ground floor, located at the corner of McAllister Street and Laguna Street. There is no onsite parking. Labor Requirements:This is a prevailing wage project. All carpenter and laborer trades must be union. Sub-Contracting Goal:25% SBE participation goal. Schedule: 09/01/26 – Start of Advertisement 09/17/26 – RFI Deadline 09/11/26 – Prebid Meeting at 10:00 AM (optional) Microsoft Teams meeting Join: https://teams.microsoft.com/meet/268156520923186?p=n5ToISzGsv8adAaJq9 Meeting ID: 268 156 520 923 186 Passcode: Yt3Pt32R 10/01/26 – Bids Due 2:00 PM Thursday. March 2027 – Tentative Construction Start (Refer to Exhibit C) Contractor Contacts: Chandu Patel Malladi cmalladi@guzmangc.com Hasan Demirkol hdemirkol@guzmangc.com Please do not contact the Owner, Owner Agents, and/or Architect directly. Bid Documents: All documents for this bid can be downloaded from the project site on Building Connected, which you have access to via the email invite you received. Also, the project information is available at the following Box link: https://www.dropbox.com/scl/fo/h5pjrj2p1tzbch9dvjinx/AHL8whRtqsxEhMumRrD8ExI?rlkey=2l6r9ths8lwukaam59czxlno0&dl=0 Guzman Construction Group Inc. - FREEDOM WEST - 880 MCALLISTER STREET, SAN FRANCISCO, CA Email To Friend« Go Back |
|





