Sub Bid Requests

 
 
 
REQUEST FOR QUOTES FROM CERTIFIED
SF Contract Monitoring Division (CMD Certified Local, Small & Micro-LBE’s
SUBCONTRACTORS/SUPPLIERS FOR:
 
Folsom Area Stormwater Improvements – Harrison/Treat Box Sewer & Connecting Auxiliary Sewers Contract No. WW-719CR
Owner: San Francisco Public Utilities Commission (SFPUC)
 
20% LBE Participation Requirement
 
BID DATE:  January 22, 2025 at 2:00 PM
 
Flatiron Dragados West LLC is soliciting quotes from SF Contract Monitoring Division Local, Small & Micro-LBE SUBCONTRACTORS/SUPPLIERS for the following scopes of work, but not limited to Divisions 02, 03, 05, 09, 26, 31, 32, 33, 34 & 40 or:CAS, Concrete Demolition, Erosion Control, AC Paving, Cold Plane AC, AC Dike & Curbs, Rebar, Tie Down Anchors, Underground Utilities, Striping & Pavement Markings, Grind PCC Pavement, PCC Paving, PCC Demo, Ready Mix, Concrete Pumping, Trucking, HAZ MAT Trucking, SWPPP Plan, SWPPP Materials, Sheet Pile Installation, Dewatering, Vibration Monitoring, Asbestos Monitoring, Survey, Quality Control Testing, Cured-In-Place Liner Pipe, Water Utility Distribution Piping, Emergency Firefighting Water System (EFWS) Work, EFWS High Pressure Ductile Iron Gate Valves, V-Bio Polyethylene Encasement of Ductile Iron Pipe, Viscoelasctic Joint Wrap, Removal of SFWD-Owned Valve Box & Cover, Installation of Steel Pipeline, Fabrication Steel Pipeline, Field Welding Steel Pipe, Excavation for Installation of Service Pipe By SFWD, Steel Pipe Appurtenances, Sanitary Work Practices & Disinfection of Water Utility Distribution, Groundwater Wells, Sanitary Sewerage Utilities, Cement-Mortar Lining of Steel Pipe, Cement-Mortar Lining of Steel Pipe In Place, Traction Power Poles, Overhead Cable Suspension, Overhead Cable Isolation, Overhead Special Work, Overhead Testing & Acceptance, Concrete Crack Repair, Concrete Spall Repair, Cast-In Concrete Anchors for DSBS, Concrete Reinforcing, Drilled Dowels & Anchors, Cast-In-Place Concrete, Cast-In-Place Curb Ramp Concrete – Site Work, Grouting, Fabricated Metalwork & Miscellaneous Items for EFWS Work, High Performance Coatings, Valve And Gate Actuators, Fiberglass-Reinforced Plastic Sluice Gates, Process & Facility Control System Testing, Instrumentation & Control Systems, Local Control Station & Control Panel Construction, Control System Equipment, Harrison Treat Box Sewer & Connecting Auxiliary Sewers Control Strategy, Electrical (for Sluice Gate Actuator), Basic Electrical Materials & Methods (for Traction Power), Low Voltage Electrical Power Conductors & Cables, Grounding & Bonding for Electrical Systems, Grounding, Raceway & Boxes For Electrical Systems, PGRS Conduit & System Components, Underground Ducts & Raceways - Electrical Systems, Identification For Electrical Systems, Overcurrent Protective Device Coordination Study (and Arc Flash Hazard Analysis), Commissioning of Electrical Systems, Wiring Devices and Enclosed Switches & Circuit Breakers.
 
The Local Business Enterprise (“LBE”) participation requirement is 20% (CMD-Certified San Francisco LBEs ONLY).  Flatiron requests that all Non-LBE Subs and Suppliers consider utilizing LBE firms as 2nd tier firms as part of their quotes to assist us in achieving the project goal.  Please indicate any lower-tier LBE firm participation on your quote.
 
Information regarding the plans and specifications is available through the SFPUC website at http://contracts.sfwater.org
Quotes must be valid for same duration as specified by Owner for contract award. Quotes will be broken down into comparable packages as reasonably necessary to facilitate participation.  Flatiron intends to work cooperatively with all firms for scopes of work you are licensed and qualified to perform.  Scopes of work can be split to facilitate participation from certified firms.  Assistance in obtaining bonding, lines of credit, insurance, equipment, supplies and materials is available upon request.
 
Subcontractors are required to possess and maintain a current contractor’s license and must also be registered with the Department of Industrial Relations (DIR) as required by Public Contract Code Section 1725.5.  Subcontractors will be required to execute Standard Subcontract Terms and Conditions and meet insurance requirements.  A copy of our Standard Subcontract Terms and Conditions is available in electronic format upon request.
 
Bond Requirements: Notwithstanding any contrary language in a bid to Flatiron Dragados or any prior course of dealing between Flatiron Dragados and a bidder, and unless waived in writing by Flatiron Dragados, we reserve the right to require each bidder to provide payment & performance bonds assuring bidder’s obligations to Flatiron Dragados in the amount of 100% of the bid.  We will reimburse the bond premium cost up to, and not to exceed 2%.  The surety on the bonds must be a California admitted surety.
 
Please email all quotes to NorCalBids@FDcorp.com or to our BID FAX at 707-746-1603.
 
Flatiron Dragados West LLC
1200 Concord Avenue, Suite 465 Concord, CA 94520
Phone 707-742-6000   Bid Fax 707-746-1603
Quotes can be emailed to: NorCalBids@FDcorp.com
An Equal Opportunity Employer
License No. 772589

Flatiron Dragados West LLC - Folsom Area Stormwater Improvements – Harrison/Treat Box Sewer & Connecting Auxiliary Sewers Contract No. WW-719CR


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



SBE Northeast
 


Louisiana Business JournalArchive