|
|
Sub Bid Requests
License# 422496
DIR# 1000005190
555 Exchange Court
Livermore, CA 94550
Project: Sun City Palm Desert Water Main Replacement
Phase 2B Project
Specification No. 2025-7
Owner: Coachella Valley Water District
Bid Date: November 20th, 2025 @ 2:00 P.M.
*** THIS IS AN ELECTRONIC BID PLEASE HAVE ALL QUOTES TO ESTIMATING
BY 12PM ON BID DAY TO ENSURE THEY HAVE BEEN RECEIVED AND REVIEWED***
We are requesting quotes from all qualified Subcontractors and Suppliers but not limited to:
AGGREGATES, ASPHALT, CONCRETE MATERIAL, SLURRY, LOW DENISTY CELLULAR GROUT, PIPE SUPPLIERS, AC OILS, ADJUST MH/WV, ASPHLAT GRINDING, CCTV, CONCRETE FLATWORK, CONSTRUCTION AREA SIGNS, DEMOLITION, EROSION CONTROL, LANDSCAPING/IRRIGATION, SAW CUTTING, STRIPING, SURVEYING, SWPPP, TRAFFIC CONTROL, CONVEYOR/EQUIPMENT RENTAL, TRUCKING, FLOWABLE FILL, DIP.
Project Description:
The scope of work includes but is not limited to; furnish and install all labor, material and equipment to construct approximately 19,164 linear feet of 8-inch diameter ductile-iron watermain pipe, 542 linear feet of 12-inch ductile-iron watermain pipe and 990 linear feet of 18-inch ductile-iron watermain pipe, including water service connections, fire hydrant assemblies, valves (including air & vacuum and blow-off), flanged fittings.
Project information, including plans & specifications can be found by contacting:
Please feel free to contact Mountain Cascade, Inc. at 925.373.8370 with any questions concerning bonding, insurance, lines of credit, and job overview. We look forward to your response.
Mountain Cascade Inc. is an Equal Opportunity Employer California License # 422496
This is Part of a Good Faith Outreach. Your response is greatly appreciated
Mountain Cascade Inc. - Sun City Palm Desert Water Main Replacement / Phase 2B Project Email To Friend« Go Back |
|





