|
Sub Bid Requests
DeSilva Gates Construction (DGC) is preparing a bid as a Prime Contractor for the project listed below:
PROJECT: CALAVERAS BOULEVARD NEAR-TERM IMPROVEMENTS – Contract C23056 Small Business Enterprise Goal Assigned is 25% OWNER: SANTA CLARA VALLEY TRANSPORTATION AUTHORITY 3331 North First Street, Building B, San Jose, CA 95134 BID DATE: APRIL 29, 2024 @ 2:00 P.M. ESTIMATOR:PAUL BRIZUELA DGC is soliciting quotations from certified Small Business Enterprises, for the following types of work and supplies/materials including but not limited to: AC DIKE, CLEARING AND GRUBBING/DEMOLITION, CONSTRUCTION AREA SIGNS, ELECTRICAL, EMULSION SUPPLIER, K-RAIL SUPPLIER, LEAD COMPLIANCE PLAN, METAL BEAM GUARDRAIL, ROADSIDE SIGNS, SAWCUTTING, STRIPING, TEMPORARY EROSION CONTROL, TRAFFFIC CONTROL SYSTEMS, UNDERGROUND, VEGETATION CONTROL, TRUCKING, WATER TRUCKS, STREET SWEEPING, EROSION CONTROL MATERIAL, CLASS 2 AGGREGATE BASE MATERIAL, HOT MIX ASPHALT (TYPE A) MATERIAL, EROSION CONTROL, SWPPP/WATER POLLUTION CONTROL PLAN PREPARATION. Plans and specifications may be reviewed at our offices located at 11555 Dublin Boulevard, Dublin, CA and 3855 North Freeway Boulevard, Suite 100, Sacramento, CA or at your local Builders Exchange, or reviewed and downloaded from the dropbox site at https://www.dropbox.com/sh/5rvdc1bwfbasgl9/AABbrd0ba51_kN3GtAESfBUoa?dl=0 or from the Owner’s site at https://secure.procurenow.com/portal/vta Fax your bid to (925) 803-4263 or email to dgcestimating@desilvagates.com to the attention of Estimator Paul Brizuela. If you have questions for the Estimator, call at (925) 829-9220. When submitting any public works bid please include your DUNS number and DIR number. For questions regarding registration for DIR use the link at www.dir.ca.gov/Public-Works/PublicWorks.html If you need SBE support services and assistance in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies or related assistance or services, for this projectcall the Estimator at (925) 829-9220, or contact your local Small Business Development Center Network (http://californiasbdc.org) or contact the California Southwest Transportation Resource Center (www.transportation.gov/osdbu/SBTRCs). DGC is willing to breakout portions of work to increase the expectation of meeting the SBE goal. At our discretion, 100% Payment and 100% Performance bonds may be required as a subcontract condition. This will be a PREVAILING WAGE JOB. DGC is an Equal Opportunity/Affirmative Action Employer. DeSilva Gates Construction - CALAVERAS BOULEVARD NEAR-TERM IMPROVEMENTS – Contract C23056 Email To Friend« Go Back |
|