Sub Bid Requests

 
Request for Quotes from Certified DBE/MBE/WBE/SBE Subcontractors and Suppliers
 
Project: Ground Water Replenishment System Final Expansion, Contract No. GWRS-2019-01
Owner:  Orange County Water District
Bid Date: July 23, 2019 at 2:00 p.m.
Clean Water State Revolving Fund Project
SWRCB DBE Forms are REQUIRED from Subcontractors
 
DBE Participation Encouraged
 
Quotes requested for Divisions 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 13, 14, 15, 16 and 17 for the following, but not limited to, scopes of work: Aggregate Supply, Asphalt Paving, Augured Pressure Grouted Piles, Bitumen Roofing, Bridge Cranes, Cathodic Protection, Cement Deep Soil Mixing, CMU, Concrete Finishing, Concrete Supply, Demolition, Dewatering, Doors and Frames FRP, Doors and Frames Steel, Electrical, Fabricated Slide and Control Gates, Finish Hardware, Fire Protection , Fire Sprinkler System, Geotextiles, Glazing, GRF Plastic, Grouting, Gypsum Board, HVAC, Hydraulic Elevator, Instrumentation and Controls, Landscape and Irrigation , Louvers, Masonry, Metal Framing, Metal Gratings, Metal Roofing, Metals Fabrications, Minor Concrete, Painting and Coating, Pipe Insulation, Pipe Supply, Plumbing Piping, Prestressing Concrete Tank, Pumps, Railings, Reinforcing Steel, Sheet Metal, Shoring, Signage, Steel Decking, Steel Joist, Translucent Skylights, Waterproofing, Welding.
 
PLEASE SUBMIT QUOTES BY EMAIL TO socalbids@flatironcorp.com OR BY FAX TO (909) 597-8635.
 
Plans and specifications are available at no cost, from Flatiron in electronic format or can be viewed at our offices in San Marcos or Chino Hills.  Please call to request access or to make an appointment to view the documents at one of our offices.
 
This is an American Iron and Steel project.  Quotations must be valid for same duration as specified by Owner for contract award. Assistance in obtaining bonding, lines of credit, insurance, equipment, supplies and materials is available upon request.  Flatiron West, Inc. analyzes and considers each DBE quote, including those that are broken down into economically feasible units to facilitate bidding.
 
Subcontractors are required to possess and maintain a current contractor’s license and must also be registered with the Department of Industrial Relations (DIR) as required by Public Contract Code Section 1725.5.  Subcontractors will be required to execute Flatiron’s Standard Subcontract Terms and Conditions and meet insurance requirements.  A copy of our Standard Subcontract Terms and Conditions is available in electronic format upon request.
 
Notwithstanding any contrary language in a bid to Flatiron West, Inc. (“Flatiron”) or any prior course of dealing between Flatiron and a bidder, and unless waived in writing by Flatiron, Flatiron reserves the right to require each bidder to provide payment and performance bonds assuring bidder’s obligations to Flatiron in the amount of 100 percent of the bid to Flatiron. Flatiron will reimburse the bond premium at actual cost not to exceed 3%. 
 
Non-DBE Subs/Suppliers: Indicate lower tier DBE participation offered on your quotation as it will be evaluated with your price.
 
Flatiron West, Inc.
1770 La Costa Meadows Drive, San Marcos, CA 92078
Phone (909) 597-8413 Ext. 2009 / FAX (909) 597-8635
Email: socalbids@flatironcorp.com
Point of Contact: Jannette Carter, Estimating Administrator
 
WE ARE AN EQUAL OPPORTUNITY EMPLOYER

Flatiron West, Inc. - Ground Water Replenishment System Final Expansion, Contract No. GWRS-2019-01


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



Archive




 


Connect with us