|
|
Sub Bid Requests4275 Executive Square, Suite 250, La Jolla, CA 92037 | (619) 768-8848 Invitation To Bid (ITB) – SBE, SDVOSB and VOSB certified firms encouraged to submit proposals. Project: San Diego Airport Terminal 2 East Lounge Expansion C&S | Location: 3225 North Harbor Drive, San Diego, CA Proposal Publish Date: 4/27/2026 | Proposal Due Date: 5/20/26 at 5pm | Anticipated project start: 7/1/2026 REQUEST FOR PROPOSAL:Webcor Builders is requesting your assistance with bidding and schedule input for the above-mentioned project. This is not a full RFP. Please use the Building Connected public project link to view the full RFP and submit your proposal: https://app.buildingconnected.com/public/5430e7ba5cdc2e0300dd8923/projects/69e14b42fcdf1a77f805675c Webcor intends to select the lowest responsible, and responsive bidder. A. PROJECT SUMMARY: Elevated 1-story, 8,200 sf core and shell building addition at the concourse level of Terminal 2 East to accommodate the future expansion of the existing Lounge (by others). The addition will be built with fireproof-encapsulated steel members, a metal panel and curtain wall glazing exterior envelope, and a PVC roof matching the adjacent construction. A new open-air egress stair will also be constructed from the concourse to the apron level, and one existing adjacent open-air egress stair will be removed and replaced. Additional work includes pavement replacement at the apron level, restriping, and some signage. The Work further encompasses all necessary services and appurtenances to deliver an operable building shell, including sewer, grease line, water, electrical power, low-voltage technology (IT/Security), lighting, interior and exterior fire sprinklers, fire alarm, and rooftop mechanical systems. B. SCOPES OF WORK FOR THIS RFP:
C. PREQUALIFICATION: All trade contractors upon selection are required to be prequalified by Webcor Builders for your proposal to be accepted and to enter into contract. Check your prequalification status: www.webcor.com/subcontractors or email prequal@webcor.com for support. D. PROJECT CONTACTS:Sam Khatibi, SKhatibi@webcor.comand April Chang, april.chang@webcor.com Webcor Builders - San Diego Airport Terminal 2 East Lounge Expansion C&S Email To Friend« Go Back |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||





