|
|
Sub Bid Requests
DeSilva Gates Construction LLC (DGC) is preparing a bid as a Prime Contractor for the project listed below:
PROJECT: ANNUAL STREET OVERLAY/REHABILITATION 2019-21 – PHASE III Project No. 2020.0050, Bid No. 25-26.011 Local Business Enterprise Goal Assigned is 25% OWNER: CITY OF SAN LEANDRO – 835 East 14th Street, 2nd Floor, San Leandro, CA 94577 BID DATE: MARCH 19, 2026@ 3:00 P.M. ESTIMATOR:QUINN HANCE DGC is soliciting quotations from certified Local Business Enterprises, for the following types of work and supplies/materials including but not limited to: ADJUST IRON, CLEARING AND GRUBBING/DEMOLITION, COLD PLANE, ELECTRICAL, LANDSCAPING, MINOR CONCRETE, STRIPING, SURVEY/STAKING, SWPPP/WATER POLLUTION CONTROL PLAN PREPARATION, TRAFFIC CONTROL SYSTEMS, TRUCKING, WATER TRUCKS, STREET SWEEPING, HOT MIX ASPHALT (TYPE A) MATERIAL, RUBBERIZED HMA (OPEN GRADE) MATERIAL. Plans and specifications may be reviewed at our offices located at 11555 Dublin Boulevard, Dublin, CA and 3855 North Freeway Boulevard, Suite 100, Sacramento, CA or at your local Builders Exchange, or reviewed and downloaded from the dropbox site at https://www.dropbox.com/sh/5rvdc1bwfbasgl9/AABbrd0ba51_kN3GtAESfBUoa?dl=0 or from the Owner’s site at https://www.sanleandro.org/Bids.aspx Fax your bid to (925) 803-4263 or email to dgcestimating@desilvagates.com to the attention of Estimator Quinn Hance. If you have questions for the Estimator, call at (925) 829-9220. When submitting any public works bid please include your DUNS number and DIR number. For questions regarding registration for DIR use the link at www.dir.ca.gov/Public-Works/PublicWorks.html If you need LBE support services and assistance in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies or related assistance or services, for this projectcall the Estimator at (925) 829-9220, or contact your local Small Business Development Center Network (http://californiasbdc.org) or contact the California Southwest Transportation Resource Center (www.transportation.gov/osdbu/SBTRCs). DGC is willing to breakout portions of work to increase the expectation of meeting the LBE goal. At our discretion, 100% Payment and 100% Performance bonds may be required as a subcontract condition. This will be a PREVAILING WAGE JOB. DGC is an Equal Opportunity/Affirmative Action Employer. DeSilva Gates Construction - ANNUAL STREET OVERLAY/REHABILITATION 2019-21 – PHASE III Email To Friend« Go Back |
|





