|
Sub Bid Requests
DeSilva Gates Construction (DGC) is requesting bids for the project listed below:
PROJECT:
TREASURE ISLAND GEOTECHNICAL ZONE 3 AND 4 (STAGE 2) DEMOLITION, CUT & CAP UTILITIES
OWNER:
TREASURE ISLAND DEVELOPMENT GROUP
1 Sansome Street, Suite 3200, San Francisco, CA 94104
CM/GC: DESILVA GATES CONSTRUCTION
11555 Dublin Boulevard, Dublin, CA 94568
Small Business Enterprise Goal Assigned is 41%
BID DATE: MONDAY, JUNE 2, 2025 @ 5:00 P.M. ESTIMATOR: BOB KLUBALL
We hereby encourage responsible participation of local Small Business Enterprises/Local Business Enterprises, and solicit their contractor or materials and/or suppliers’ quotation for the following types of work including but not limited to:
TEMPORARY FENCING, BUILDING ABATEMENT, BUILDING DEMOLITION, INSTALL WATER SYSTEMS, STORM DRAINAGE, ELECTRICAL, SURFACE PAVEMENT DEMOLITION, CLEARING & GRUBBING AND REMOVAL AND DISPOSAL OF EXISTING UTILITIES.
There will be a Prebid Meeting and Job Walk on Thursday May 22, 2025 @ 1:30 PM at the Second Floor Conference Room, Building 1, Suite 216 Treasure Island. The meeting may be attended in person or via Teams at the following link:
Meeting ID: 272 374 652 610 5
Passcode: U8Eo6PT3
Dial in by phone
+1 469-998-7931,,753759212# United States, Dallas
Phone conference ID: 753 759 212#
Plans and specifications may be reviewed and downloaded from the Dropbox sites at:
Project Specific:
https://www.dropbox.com/scl/fo/fob9eo18u9xyvj7ytqmc1/AERmB_U4P9VlxgI-uO7i2bI?rlkey=2oayobsk19ji1utrvzntas0xb&st=gn1nijff&dl=0
Project/Treasure Island General Documents:
Email bids to bkluball@desilvagates.com to the attention of Estimator Bob Kluball no later than Monday June 2, 2025 at 5:00 PM. If you have questions, please email.
With all bids please clarify if you are San Francisco SBE/LBE Certified and your Bonding Rate.
If you need SBE/LBE support services and assistance in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies or related assistance or services for this project, email bkluball@desilvagates.com to the attention of Bob Kluball. DGC is willing to breakout portions of work to increase the expectation of meeting the SBE/LBE goal.
At our discretion, 100% Payment and 100% Performance Bonds may be required as a subcontract condition. This will be a prevailing wage job and Subcontractor’s will be required to agree to a Project Labor Agreement. DGC is an Equal Opportunity/Affirmative Action Employer.
DeSilva Gates Construction - TREASURE ISLAND GEOTECHNICAL ZONE 3 AND 4 (STAGE 2) DEMOLITION, CUT & CAP UTILITIES Email To Friend« Go Back |
|