Sub Bid Requests

 
 
 
REQUEST FOR SUBCONTRACTORS/SUPPLIERS/SERVICE PROVIDERS
 
Santa Clara Valley Water District (Valley Water)
Anderson Dam Seismic Retrofit Project
 
SBE Participation is Encouraged
 
EE: $1.2B to $2B         

Bid Date: June 24th, 2026 at 2:00 PM
 
**QUOTES NOT RECEIVED BY JUNE 19TH, 2026 MAY NOT BE REVIEWED OR EVALUATED**
 
FlatironDragados Sukut ADSRP Joint Venture (FDSJV), requests SBE subcontractor/supplier/service participation for the following Items of work, but not limited to: CAS/ Roadway Signs, Demo, Clear Grub, Erosion Control, Landscaping & Irrigation, AC Paving, Cold Plane AC, Joint Seal Assembly, Rebar, Pipe Coatings, AC Dike or Curbs, Underground Utilities, Fencing, Metal Railing, MBGR, Striping, Electrical, Minor Concrete, Aggregate Class 2 AB Rip Rap, Sand Filters, Ready Mix, Concrete Pumping, Furnish Steel Sheet Piles, Welded Steel Pipe 10’-12’-13’ Diameter, Underground Pipe Products APC & RCP, Misc. Iron & Steel, Misc. Metals, Trucking, SWPPP Plan, SWPPP Materials, Lead Compliance Plam, Geotextile Materials, Underground Precast, Street Sweeping, Traffic Control, Mechanical Equipment (Furnish & Install).

100% performance/payment bonds will be required for the full amount of the subcontract price. Please contact FDSJV for any assistance to this solicitation, including obtaining bonding, insurance, equipment, materials and/or supplies. Provide subcontractor/supplier scopes/quotes as early as possible to enable estimators to perform a thorough evaluation of all quotes received. Quotes will be broken down into comparable packages as reasonably necessary to facilitate participation. Quotes must be valid for the same duration as specified by the Owner for Contract Award. We are signatory to Operating Engineers, Laborers, Cement Masons, Carpenters and Pile Drivers Unions. Non-signatory subs will be required to sign an agreement for trades covered under our union agreements. FDSJV intends to work cooperatively with subcontractors and suppliers for all bid items you are licensed and qualified to perform. Bid items can be split to facilitate participation from all certified firms. FDSJV will reimburse for bond premium up to 2%. Firms must possess & provide current contractor’s license number & DIR Registration number on the quote. Firms must possess insurance and workers compensation coverage meeting project requirements. Waiver of Subrogation is required. Please contact FDSJV for any assistance required by your firm. Subcontractors/Suppliers will be required to execute our standard agreements and agree to the standard general terms & conditions. Copies are available for review on our Box.com ftp site upon email request. 

To view and download projects docs you must complete a fully executed NDA for FDSJV and Valley Water.  Once we receive the executed NDA, we will provide a BOX link for your firm to access the project documents.  No exceptions will be made.  The NDA is a Valley Water requirement.
 
To receive a copy of the NDA for access to the project documents from our FD BOX ftp site, please send an email request to NorCalBids@FDcorp.com

You will be provided with a BOX link to view & download plans and specs for FREE from our BOX.com ftp site.  Please send an email if you would like to schedule an appointment to review project docs virtually or meet with an estimator.  These services are offered by appointment only. 
 
Please send all quotes by email to NORCALBIDS@FDcorp.com
 
FlatironDragados Sukut ADSRP Joint Venture
1200 Concord Ave., Suite 465, Concord, CA 94520
Phone 707-742-6000   Bid Fax 707-746-1603
An Equal Opportunity Employer

FlatironDragados Sukut ADSRP Joint Venture - Santa Clara Valley Water District (Valley Water) Anderson Dam Seismic Retrofit Project


Email To Friend

Your name
Your email *
Your friend's email *
Your message


« Go Back



SBE Northeast
 


Louisiana Business JournalArchive